From initial consultation to post-completion support, we manage every phase of your project systematically, ensuring that designs are translated faithfully onto the physical layout.
Initial workshop defining project visions, core budget constraints, and feasibility parameters.
Client brief, floor plans or raw site photos, and general budget ranges.
Initial PMC consultation report, technical feasibility review, and estimated PMC fee.
Deep dive assessment mapping technical, functional, structural, and regulatory parameters.
Architectural concept files, local Guwahati municipal bylaws, structural guidelines.
Technical risk matrices, structural restriction plans, and detailed client requirement log.
Developing critical-path baselines, milestone charts, and resource schedule frameworks.
Approved requirement logs, vetted vendor capacities, and regional material lead-times.
Project Master Schedule, critical-path analysis chart, and milestone baseline plans.
Reviewing spatial drawings to eliminate structural and trade clashes before groundbreaking.
Architectural drawings, structural files, electrical and plumbing layouts.
Drawing coordination matrix, design discrepancy report, approved Coordinated Construction Drawings.
Precise cost calculation, material sizing, and itemized Bill of Quantities (BOQ) preparation.
Coordinated drawings, material selections, and specific brand directives.
Itemized Bill of Quantities (BOQs), preliminary cost estimates, and brand rate analysis lists.
Structured competitive bidding, bid normalization, and contractor evaluation checklists.
Approved BOQs, tender packages, shortlisted contractor profiles.
Tender floating package, comprehensive commercial comparison sheet, and contractor SLAs.
Daily on-site supervision of craftsmanship, safety protocols, and weekly progress charts.
Contract agreements, master timelines, material sample sign-off cards.
Daily progress logs, weekly progress reports, material on-site test lists.
Enforcing strict, zero-tolerance technical checklists at every milestone stage.
Approved designs, quality standards manual, on-site mockups.
Quality audit logs, field inspection reports, and defect logs.
Detailed walk-throughs, Snag List creations, and defect correction controls.
Complete installations, handover protocols, and as-built drawings.
Digital Snag List with photo evidence, defect rectification sign-offs, and handover dossiers.
Active site monitoring, warranty coordination, and technical support during DLP.
Completed project files, manufacturer warranties, maintenance checklists.
Defect liability monitoring logs, warranty claims logs, and post-occupancy quality audits.
By enforcing this 10-Step Quality Assurance Cycle, DS Wave Studio provides unmatched corporate excellence and financial safeguards for your interior investments.